Check Type of Application: □ Building Permit □ Conditional Use Permit
□ Variance □ Zoning Amendment □ Home Business □ Subdivision
When do I need to
make a Building and Zoning Application?
Building Permit – when constructing or moving any new structure,
making interior or exterior alterations
Conditional Use Permit – when you intended use falls under a Conditional Use
for the Zoning District of the property.
Variance – when your property use requires an exception to the
requirements outlined in the Badger City Zoning Ordinance, including any use
not specifically listed as a permitted use or a conditional use.
Zoning Amendment – when you would like to have your property and/or
other property re-zoned from one zoning district to another.
Home Business – when you are running a business in your home which
employs only family members (employing non-family members requires a
conditional use permit).
Subdivision – when you dividing existing parcels of property.
APPLICANT INFORMATION (please print)
Name:_______________________________________________ Telephone #: ______________________
Address:_______________________________________________________________________________
Builder / Contractor (if known at time of application):
__________________________________________
Application is for: □ new construction □ demolition □ moving
□ alteration □ change in use
Proposed Use:
__________________________________________________________________________
Dimensions: (l x w x
h)_________________________ Estimated cost of project:
$______________
The City Clerk will check all the required items you need to
provide on the next page of this application (the Site Plan).
Have all applicable floodplain, shoreland, septic system,
wetland, and feedlot regulations been cleared?
□ YES □ NO
______________________________________________ ____________________________
Signature of Applicant Date
Approvals Needed (City Clerk
will check):
_____City Clerk _________________________________(signature) ________________________(date)
_____City Council
________________________________(signature)
________________________(date)
_____Building Inspector
___________________________(signature)
________________________(date)
Site Plan
The City Clerk or Building Official will check the box in front of all items that apply to your request. Information may be provided on this page or attached pages.
Site Plan
□ Legal description and lot size of the proposed
development.
□ The location
of, distance to, and size of adjoining boundary lines, drainage systems,
roadways, public utilities, residential properties, lagoons, kennels,
recreational areas, sensitive natural areas, racing facilities, feedlots,
parking lots, principal buildings, accessory uses, storage areas, required
buffers, existing improvements and easements.
□ Soil
information.
□ Plans for
sanitary sewage disposal and surface drainage.
□ Location and
size of access to streets.
□ Landscaping
and elevation plans.
□ Stages and
timing of development program.
□ Subdivision
according to Article XIV (as amended) subdivision of the Badger Zoning
Ordinance.
□ Such other information as may be requested by the
governing body. (Items may include drawings, engineering reports, land surveys,
etc.)
City Clerk or Building Official should list below:
___________________________________________________
___________________________________________________
___________________________________________________
___________________________________________________
Building Permit
Procedures
1. PERMIT APPLICATION
→Address
/ location
→Owner
→Builder
/ Permitee
→Use
of Building
→Set
of Plans (small projects may be oral with building official)
→Certification
of Survey (may be requested if boundaries are uncertain)
2. FEES
|
→ |
Building Permit (minimum) |
|
$ 25.00 |
|
→ |
Conditional Use Permit |
|
$ 20.00 |
|
→ |
Variance |
|
$ 25.00 |
|
→ |
Zoning Amendment |
|
$ 50.00 |
|
→ |
Subdivision |
|
$100.00 |
|
→ |
Building Inspection Fee |
|
$0.0025 of valuation |
|
→ |
State Surcharge |
|
$0.0005 of valuation |
3. INSPECTIONS
After
permit is signed by Building Official, IT IS THE PERMITEE’S RESPONSIBILITY TO
REQUEST IN ADVANCE THE FOLLOWING INSPECTIONS:
→Reinforcing
steel and structural framework must be approved by the Building Official BEFORE
covering.
→Foundation
inspection.
→Concrete
slab or under-floor inspection.
→Frame
inspection.
→Insulation
inspection.
→Lath
and/or gypsum board inspection when part of a structure or fire-related
assembly.
→Manufactured
home setup inspection (MSBC 1350.2100).
→Re-roofing
inspection at completion of work (UBC Appendix 1515.2.2).
→Final
inspection.
→Special
inspections as required by UBC Chapter 17 (special inspections specified by the
engineer of record to be approved by the Building Official may include but are
not limited to soils, concrete, welding, high-strength bolting, spray-applied
fireproofing and pilings).
→Other
inspections as required by the Building Official to verify compliance with the
building code and other laws which are enforced by the code enforcement agency.
The
Building Official is responsible to determine which inspections are necessary
for all construction activity regulated by the code. Other codes may have additional inspection
requirements.
4. CONTACT
PERSON
Please
contact Building Official AT LEAST ONE WORK DAY IN ADVANCE for highlighted
inspections.
Specification
for Application
Manufactured
Home Placement in the City of
General
Information
City of
Article V. GR-General Residential District
Section 3. Uses Requiring Conditional Use Permits
2) Single family dwellings with 750 square feet of gross floor space per dwelling unit and 12 feet wide at the narrowest point.
Section 4. Performance Standards for All Residential Districts
B. Minimum Dwelling Size
1) Single family and two family dwellings located in all Residential Districts shall provide 950 square feet of gross floor area per dwelling unit, shall be 20 feet wide at the narrowest point, and shall be affixed to a permanent foundation as defined with a Conditional Use Permit.
2. Single Family and two family dwellings may provide 750 square feet of gross floor area per dwelling unit and may be 12 feet wide per dwelling unit at the narrowest point with a Conditional Use Permit.
ALL persons moving a manufactured
home into or out of (including those manufactured homes that will be placed in
mobile home parks) of the City of
ANY mobile home court owner or ANY person moving a manufactured home into a manufactured home into a mobile home park MUST apply for city water / sewer service and pay the required deposit before service will be provided by the City and / or mobile home park owner.
BUILDING PERMIT APPLICANT: PROPERTY OWNER
I understand that the State of
Furthermore, I acknowledge that I may be hiring independent contractors to perform certain aspects of the construction or improvement of this house and I understand that unlicensed residential contracting, remodeling, and/or roofing activity is a misdemeanor under Minnesota law, and that I would forfeit my rights to reimbursement from the Contractor’s Recovery Fund in the event that any contractors I hire are unlicensed.
____________________________________
Signature of Homeowner
____________________________________
Date
To determine whether a particular contractor is required to be licensed, or to check on the licensing status of individual contractors, please call the Minnesota Department of Commerce, Enforcement Division at (612) 296-2594, or toll-free at (800) 657-3602.